Saturday, June 11, 2016

On-Chip Variation Delay Analysis

During timing analysis, the tool uses the on-chip variation(OCV) mode to perform timing, which models the effects of variation in operating conditions across the chip. This mode performs a conservative timing analysis by simultaneously applying minimum and maximum delays to different paths.

For a setup check, the tool uses maximum delays for the launch clock path and data path and minimum delays for the capture clock path, as shown in the following figure.


No comments:

Post a Comment